Our Projects
Development of projects for
national and international clients
We inspire trust and confidence in our clients.
See More
Pesqueria Plant | Civil and Structural Engineering
*Shelters, scrap disposal 1 and 2
*Electrical rooms for galvanizing line 1
*Acid regeneration plant
*Foundations for equipment on painting line 1
*Foundations for equipment on galvanizing line 2
*Storm drainage system for the hot rolling mill facility
Puebla Plant
*Structural inspection and reinforcement of the facility
Tultitlan Plant
*Structural inspection and reinforcement of the facility
Largos Norte Plant
*Civil engineering for shear and pantograph foundations
See More
*Civil engineering for equipment foundations on painting line 1
Alzada Plant
*Civil engineering for electrical room foundations
See More
*Civil engineering for structures, corridors, and bridges
See More
*Nuevo León WWTP, design of various tanks
*Foundations for storage tanks (Hershey’s Escobedo)
*Foundations for tanks (Amistad Plant)
*Design of reactor and digester tanks (Grupo Star)
See More
Nayar Plant
Boiler rooms, workshops, and offices
Conmor Plant
Cold storage room, workshops, offices, and parking lots
See More
Los Mochis
Construction of a gas station with a booth and roofing
Pesqueria
Construction of a gas station with a booth, containment berm for stationary tank, roofing for the station and tank, and perimeter fencing
See More
Nogales Plant
Adaptations for the warehouse and workshop, loading dock area, syrup area, bottling area, pumping sump, compressor and central area, cold room, services area, water treatment, restrooms, industrial drainage, office area, and stormwater channel
Aguascalientes Plant
Expansion of the finished product warehouse, washing area, workshops and offices, logistics offices, route parking, production laboratory, production line, containment berm adaptation for tank, carbon filter area, general drainage, sample retention mezzanine, cooling tower, customs, bottle exchange, stormwater collector, and route tunnel.
Insurgentes Plant
Construction of finished product warehouse, customs, temporary customs, security booth, MIR, second-level offices, mechanical workshop, and roofing for finished product area
Adaptations
Topo Chico Plant
Adaptations for boiler removal in the existing area and civil and structural adaptations for the new boiler location in the cistern area
Querétaro Plant
For the Bokados facility, floor, wall, drainage, storm channel, locker room, loading dock, reception, and office adaptations were completed
See More
*Civil engineering for turpentine tank base
*Architectural design
*Civil, structural, electrical, and pipeline engineering for the new Consumer Innovation
See More
At the Cadereyta Plant, we worked on civil, structural, electrical, piping engineering, and the potable water plant.
Our Clients
Effective Solutions
for Your Trust and Peace of Mind
Contact Us
for More Information
Phone:
81 8348 8093
Email:
info@cantecc.com
Address:
Miguel Hidalgo y Costilla 330-piso 3 Int. 310, Centro, 64000 Monterrey, N.L.