Our Projects

7
See More

Pesqueria Plant | Civil and Structural Engineering

*Shelters, scrap disposal 1 and 2
*Electrical rooms for galvanizing line 1
*Acid regeneration plant
*Foundations for equipment on painting line 1
*Foundations for equipment on galvanizing line 2
*Storm drainage system for the hot rolling mill facility

Puebla Plant
*Structural inspection and reinforcement of the facility

Tultitlan Plant
*Structural inspection and reinforcement of the facility

Largos Norte Plant
*Civil engineering for shear and pantograph foundations

See More
Pesqueria Plant
*Civil engineering for equipment foundations on painting line 1

Alzada Plant
*Civil engineering for electrical room foundations

See More
*Linear park in Bosques del Valle

*Civil engineering for structures, corridors, and bridges

See More
Civil Engineering

*Nuevo León WWTP, design of various tanks
*Foundations for storage tanks (Hershey’s Escobedo)
*Foundations for tanks (Amistad Plant)
*Design of reactor and digester tanks (Grupo Star)

See More
Civil and Structural Engineering

Nayar Plant
Boiler rooms, workshops, and offices

Conmor Plant
Cold storage room, workshops, offices, and parking lots 

See More
Civil and Structural Engineering

Los Mochis
Construction of a gas station with a booth and roofing

Pesqueria
Construction of a gas station with a booth, containment berm for stationary tank, roofing for the station and tank, and perimeter fencing

See More
Master Plan Engineering

Nogales Plant
Adaptations for the warehouse and workshop, loading dock area, syrup area, bottling area, pumping sump, compressor and central area, cold room, services area, water treatment, restrooms, industrial drainage, office area, and stormwater channel

Aguascalientes Plant
Expansion of the finished product warehouse, washing area, workshops and offices, logistics offices, route parking, production laboratory, production line, containment berm adaptation for tank, carbon filter area, general drainage, sample retention mezzanine, cooling tower, customs, bottle exchange, stormwater collector, and route tunnel.

Insurgentes Plant
Construction of finished product warehouse, customs, temporary customs, security booth, MIR, second-level offices, mechanical workshop, and roofing for finished product area

Adaptations

Topo Chico Plant
Adaptations for boiler removal in the existing area and civil and structural adaptations for the new boiler location in the cistern area

Querétaro Plant
For the Bokados facility, floor, wall, drainage, storm channel, locker room, loading dock, reception, and office adaptations were completed

See More
Santa Catarina Plant

*Civil engineering for turpentine tank base
*Architectural design
*Civil, structural, electrical, and pipeline engineering for the new Consumer Innovation

See More
Our work in the Dulces Nombres, Norte Plant, Veracruz, San Martin, and Nogales plants includes architectural design, roadways, and civil, structural, electrical, and piping engineering for wastewater treatment plants.

At the Cadereyta Plant, we worked on civil, structural, electrical, piping engineering, and the potable water plant.

Our Clients

Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item
Image Item

Effective Solutions
for Your Trust and Peace of Mind

Quote your construction or architectural project today

Contact Us
for More Information

Phone:

81 8348 8093

Email:

info@cantecc.com

Address:

Miguel Hidalgo y Costilla 330-piso 3 Int. 310, Centro, 64000 Monterrey, N.L.